Whirlpool C WD R49M WBS IT tumble dryer Freestanding Front-load 9 kg White

    Whirlpool C WD R49M WBS IT tumble dryer Freestanding Front-load 9 kg White

    €465.47 Tax included
    Article Code: 608844
    2-Year Italian Warranty: logo ita

    Whirlpool C WD R49M WBS IT, Freestanding, Front-load, Heat pump, White, Rotary, Touch, 127 L

    Availability:
    Whirlpool C WD R49M WBS IT. Appliance placement: Freestanding, Loading type: Front-load, Drying system: Heat pump. Rated capacity: 9 kg, Condensation efficiency class: B, Drying programs: Auto, Cotton, Delicate/silk, Jeans/denim, Mix, Refresh, Sport, Wool. Delay start (max): 24 h. Energy efficiency class: C, Energy consumption per 100 cycles: 106 kWh, Heat source: Electric. Whirlpool technologies (clothes care): 6TH SENSE
    Design
    Posizionamento dell'apparecchioLibera installazione
    Tipo di caricaCaricamento frontale
    Sistema di asciugaturaPompa di calore
    Colore del prodottoBianco
    Tipo di controlloManopola, Touch
    Volume cestello127 L
    Display incorporatoSì
    Lunghezza cavo1,5 m
    Possibilità di incasso sottopianoNo
    Tecnologia InverterSì
    Prestazione
    Capacità cestello9 kg
    Classe di efficienza della condensazioneB
    Programmi di asciugaturaAuto, Cotone, Delicati/Seta, Jeans/denim, Mix, Refresh, Sport, Lana
    Ciclo195 min
    Classe emissione rumoreB
    Emissione acustica63 dB
    Funzione antipiegaSì
    Rotazione alternataSì
    Livello di asciugatura regolabileSì
    Efficienza di condensazione91%
    Ergonomia
    Partenza differitaSì
    Partenza ritardata24 h
    Luce interna cestelloSì
    Indicatore del tempo rimanenteSì
    Indicatore programma LEDSì
    Protezione per i bambiniSì
    Indicatore tanica pienaSì
    Wi-Fi comandatoSì
    Gestione energetica
    Classe efficienza energeticaC
    Scala di efficienza energeticaDa A a G
    Carico di collegamento800 W
    Tensione di ingresso AC230-240 V
    Frequenza di ingresso AC50 Hz
    Corrente10 A
    Consumo energetico per 100 cicli106 kWh
    Fonte di caloreElettrico
    Dimensioni e peso
    Larghezza598 mm
    Profondità674 mm
    Altezza846 mm
    Peso46 kg
    Profondità con porta aperta104 cm
    Dati su imballaggio
    Larghezza imballo650 mm
    Profondità imballo690 mm
    Altezza imballo885 mm
    Peso dell'imballo47 kg
    Altre caratteristiche
    Durata della garanzia2 anno/i

    Informazioni sul produttore

    Whirlpool EMEA S.p.A.
    Viale Guido Borghi, 27
    21025 - Comerio
    Italia

    CONTATTI
    Tel: +39 0332 759111
    Mail: whirlpool_customerexperience@whirlpool.com

    ____

    Persona responsabile dell’UE

    Operatore economico con sede nell’UE che garantisce la conformità del prodotto alle normative richieste.

    Whirlpool EMEA S.p.A.
    Viale Guido Borghi, 27
    21025 - Comerio
    Italia

    608844
    In Stock

    Data sheet

    Energy efficiency scale
    A to G
    Width
    598 mm
    Depth
    674 mm
    Height
    846 mm
    Weight
    46 kg
    Package width
    650 mm
    Package depth
    690 mm
    Package height
    885 mm
    Package weight
    47 kg
    Appliance placement
    Freestanding
    Product colour
    White
    Control type
    Rotary, Touch
    Built-in display
    Yes
    Wi-Fi controlled
    Yes
    Energy efficiency class
    C
    AC input voltage
    230-240 V
    AC input frequency
    50 Hz
    Noise emission class
    B
    Noise level
    63 dB
    Connected load
    800 W
    Current
    10 A
    Warranty period
    2 year(s)
    Cord length
    1.5 m
    Delayed start timer
    Yes
    Delay start (max)
    24 h
    Remaining time indication
    Yes
    Energy consumption per 100 cycles
    106 kWh
    Inverter technology
    Yes
    Child lock
    Yes
    Loading type
    Front-load
    Drum volume
    127 L
    Lower built-in capability (topless)
    No
    Rated capacity
    9 kg
    Anti-Crease function
    Yes
    LED program stage indicator
    Yes
    Cycle time
    195 min
    Drying system
    Heat pump
    Depth with door open
    104 cm
    Drum interior light
    Yes
    Drying programs
    Auto, Cotton, Delicate/silk, Jeans/denim, Mix, Refresh, Sport, Wool
    Moisture sensor
    Yes
    Adjustable drying level
    Yes
    Water tank full indicator
    Yes
    Heat source
    Electric
    Alternate rotation
    Yes
    Condensation efficiency class
    B
    Whirlpool technologies (clothes care)
    6TH SENSE
    Condensation efficiency
    91%

    Specific References

    • Name : 30 day return policy
    • Description

      Your RMA request has been submitted. We will pick up the item you wish to return within 6 days. We hope you understand that we only accept items for return if they have not been used or tampered with. Original packaging and accessories also need to be returned along with item.

    • Click here to get more details