Whirlpool C WD 96M WBS IT tumble dryer Freestanding Front-load 9 kg White

    Whirlpool C WD 96M WBS IT tumble dryer Freestanding Front-load 9 kg White

    €549.95 Tax included
    Article Code: 611101
    2-Year Italian Warranty: logo ita

    Whirlpool C WD 96M WBS IT, Freestanding, Front-load, Heat pump, White, Rotary, Touch, Black

    Availability:
    Whirlpool C WD 96M WBS IT. Appliance placement: Freestanding, Loading type: Front-load, Drying system: Heat pump. Rated capacity: 9 kg, Condensation efficiency class: A, Drying programs: Baby care, Cotton, Cotton eco, Down wear/duvet, Iron dry, Jeans/denim, Mix, Quick, Refresh,.... Delay start (max): 24 h, Delay start (min): 1 h. Energy efficiency class: A, Energy consumption per 100 cycles: 79 kWh, Energy consumption: 0.79 kWh. Depth: 674 mm, Width: 598 mm, Height: 846 mm
    Design
    Posizionamento dell'apparecchioLibera installazione
    Tipo di caricaCaricamento frontale
    Sistema di asciugaturaPompa di calore
    Colore del prodottoBianco
    Colore della portaNero
    Tipo di controlloManopola, Touch
    Volume cestello127 L
    Display incorporatoSì
    Materiale vascaAcciaio inox
    Lunghezza cavo1,5 m
    Possibilità di incasso sottopianoNo
    Tecnologia InverterSì
    Prestazione
    Capacità cestello9 kg
    Classe di efficienza della condensazioneA
    Programmi di asciugaturaCura del bambino, Cotone, Cotton eco, Piumino/piumone, Ferro da stiro a secco, Jeans/denim, Mix, Rapido, Refresh, Silent, Sintetico, Lana
    Ciclo260 min
    Classe emissione rumoreA
    Emissione acustica60 dB
    Funzione antipiegaSì
    Rotazione alternataSì
    Funzione stiratura facileSì
    Numero di livelli di asciugatura4
    Efficienza di condensazione94%
    Ergonomia
    Partenza differitaSì
    Avvio ritardato (min)1 h
    Luce interna cestelloSì
    Indicatore del tempo rimanenteSì
    Indicatore programma LEDSì
    Protezione per i bambiniSì
    Supporto smartphone da remotoSì
    Programmi aggiuntivi scaricabiliSì
    Wi-Fi comandatoSì
    Near Field Communication (NFC)No
    Gestione energetica
    Classe efficienza energeticaA
    Scala di efficienza energeticaDa A a G
    Carico di collegamento600 W
    Tensione di ingresso AC230-240 V
    Frequenza di ingresso AC50 Hz
    Corrente10 A
    Consumo energetico per 100 cicli79 kWh
    Consumo energetico0,79 kWh
    Consumo energetico annuo194 kWh
    Fonte di caloreElettrico
    Dimensioni e peso
    Larghezza598 mm
    Profondità674 mm
    Altezza846 mm
    Peso48 kg
    Profondità con porta aperta104 cm
    Dati su imballaggio
    Larghezza imballo650 mm
    Profondità imballo690 mm
    Altezza imballo885 mm
    Peso dell'imballo49 kg
    Altre caratteristiche
    Durata della garanzia2 anno/i

    Informazioni sul produttore

    Whirlpool EMEA S.p.A.
    Viale Guido Borghi, 27
    21025 - Comerio
    Italia

    CONTATTI
    Tel: +39 0332 759111
    Mail: whirlpool_customerexperience@whirlpool.com

    ____

    Persona responsabile dell’UE

    Operatore economico con sede nell’UE che garantisce la conformità del prodotto alle normative richieste.

    Whirlpool EMEA S.p.A.
    Viale Guido Borghi, 27
    21025 - Comerio
    Italia

    611101
    In Stock

    Data sheet

    Energy efficiency scale
    A to G
    Width
    598 mm
    Depth
    674 mm
    Height
    846 mm
    Weight
    48 kg
    Package width
    650 mm
    Package depth
    690 mm
    Package height
    885 mm
    Package weight
    49 kg
    Appliance placement
    Freestanding
    Product colour
    White
    Control type
    Rotary, Touch
    Built-in display
    Yes
    Wi-Fi controlled
    Yes
    Energy efficiency class
    A
    AC input voltage
    230-240 V
    AC input frequency
    50 Hz
    Noise emission class
    A
    Noise level
    60 dB
    Annual energy consumption
    194 kWh
    Connected load
    600 W
    Current
    10 A
    Warranty period
    2 year(s)
    Door colour
    Black
    Cord length
    1.5 m
    Delayed start timer
    Yes
    Delay start (max)
    24 h
    Remaining time indication
    Yes
    Energy consumption per 100 cycles
    79 kWh
    Inverter technology
    Yes
    Child lock
    Yes
    Loading type
    Front-load
    Drum volume
    127 L
    Lower built-in capability (topless)
    No
    Rated capacity
    9 kg
    Smartphone/tablet remote support
    Yes
    Anti-Crease function
    Yes
    LED program stage indicator
    Yes
    Easy iron function
    Yes
    Near Field Communication (NFC)
    No
    Cycle time
    260 min
    Filter cleaning indicator
    Yes
    Tub material
    Stainless steel
    Drying system
    Heat pump
    Depth with door open
    104 cm
    Drum interior light
    Yes
    Drying programs
    Baby care, Cotton, Cotton eco, Down wear/duvet, Iron dry, Jeans/denim, Mix, Quick, Refresh, Silent, Synthetics, Wool
    Moisture sensor
    Yes
    Adjustable drying level
    Yes
    Number of drying levels
    4
    Water tank full indicator
    Yes
    Downloadable additional programs
    Yes
    Energy consumption
    0.79 kWh
    Heat source
    Electric
    Delay start (min)
    1 h
    Alternate rotation
    Yes
    Condensation efficiency class
    A
    Condensation efficiency
    94%

    Specific References

    • Name : 30 day return policy
    • Description

      Your RMA request has been submitted. We will pick up the item you wish to return within 6 days. We hope you understand that we only accept items for return if they have not been used or tampered with. Original packaging and accessories also need to be returned along with item.

    • Click here to get more details